Journal

Tower Update

I finally got the mast and rotor on the tower a few weeks ago. It was an effort to say the least. It took at least five separate trips to get it all done. First to install a new rotor plate, then to lift the mast in place, followed by climb to put the antennas on the mast, which was then follwed by installing the rotor. And finally, a trip to install the rotor properly.

The "big beam" isn't up yet. I'm not sure how to get it up there on one shot. I'll either figure that out or get ahold of a buddy with a bucket truck to lift it.

I've obtained the outdoor enclosrure to house the lightning protection and (eventually) remote coax switches. Just a matter of waiting to mount it when it's not hot outside.

<< Go back to the previous page